MN: Capstone Design Project: Avon Boardwalk Redesign

Thursday, January 30, 2014

STEMM Report for above deck Architecture









Posted by Anonymous at 9:23 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

Tuesday, January 28, 2014

_______________Main Building Connection Schedule____________

                                             
Posted by Anonymous at 3:52 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

_______________Vending Hut Solution Schedule____________









Posted by Anonymous at 10:20 AM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

Avon Boardwalk Railing

Avon Boardwalk Railing
Wordpress.com

Design Brief: Team & Individual

Team Design Brief:

Design a replacement beach front walkway for the Avon Beach that has features preventing destruction during a category 5 hurricane. Design a system that will provide an off-grid power source for the walkway's electrical needs including public facilities necessary for a summer day at the beach .


Individual Design Brief:


Design and develop all superstructures located on the new Avon walkway stretching approximately from Washington Ave. to Norwood Ave including but not limited to: lighting, railings, structures to provide shade, benches, a first aid station, a beach pass vendor, and public facilities capable of accommodating no fewer than 40 visitors at a time.


  • Home
  • Calendar
  • Specifications & Limitations

Search This Blog

Blog Archive

  • ►  2013 (16)
    • ►  August (1)
    • ►  September (9)
    • ►  October (2)
    • ►  November (4)
  • ▼  2014 (7)
    • ▼  January (3)
      • _______________Vending Hut Solution Schedule______...
      • _______________Main Building Connection Schedule__...
      • STEMM Report for above deck Architecture
    • ►  February (2)
    • ►  April (2)
Simple theme. Theme images by andynwt. Powered by Blogger.