Thursday, November 14, 2013

Mentor Contacts

Mentor Contact Page
Matthew Napoli


Date:  12 September, 2013


Contact: Christopher Zoog


Medium: Phone call


Subject: Initial design brief, specs and limits viability.


Questions: Does my individual design brief and list of specs and limits make sense? Is
there anything I can add or change to make my role more viable?


Response: Based on limited knowledge on the knowledge background, Chris didn’t have
feedback on specific content, but did provide insight on my technical writing. He did suggest that I include more limits based on sizing and weight of my designs.


Conclusion: Based on the recommendations Chris made, I changed some of the wording
for my list of specs and limits. I also added limits regarding weight and size of my solutions based on the amount of weight the boardwalk would be able to support and the width of the boardwalk itself. This provided me with helpful input but also provided my mentor with more of a background on my specific role in the Avon Walkway Redesign project.
__________________________________________________________________________


Mentor Contact Page



Date:  20 September, 2013


Contact: Christopher Zoog


Medium: Phone Call


Subject: Brainstorming viability, initial thoughts.


Questions: Here are my ideas for possible alternate solutions, which ones stand out to you as potentially viable? Which ones wouldn’t work at a glance?


Response: For the boardwalk connection system Chris advised that I use concrete as my
medium because it is the strongest, and will maintain rigidity over a long period of time. Regarding my beach hut vending pass ideas he suggested that I automatically eliminate solutions that need to be removed in case of a storm. This is because the difficulty associated with removing and storing the solution will just as hard/ expensive as replacing a destroyed solution would be. Chris suggested that I base my solutions off of the storm protections features that they would include.


Conclusion: While on the phone, I was immediately able to eliminate ideas
that I knew, based on his suggestions, would be irrelevant. This was very
helpful to me because it saved me a lot of time that I would have spent developing solutions that wouldn’t work from the start. This allowed me to immediately begin working on viable solutions, and have more time to perform R&D on each one.


__________________________________________________________________________


Mentor Contact Page



Date:  25 September, 2013


Contact: Christopher Zoog


Medium: Email


Subject: Alternate solution drawings and research.


Questions: Do I provide enough information in my alternate solution document to make
a decision on which solution to choose for my final design.


Response: Based on limited knowledge on the knowledge background, Chris didn’t have
feedback on specific content, but did provide insight on my technical writing. He did suggest that I include more limits based on sizing and weight of my designs.


Conclusion: Based on the recommendations Chris made, I changed some of the wording
for my list of specs and limits. I also added limits regarding weight and size of my solutions based on the amount of weight the boardwalk would be able to support and the width of the boardwalk itself. This email exchange provided me with helpful input but also provided my mentor with more of a background on my specific role in the Avon Walkway Redesign project.


__________________________________________________________________________


Mentor Contact Page



Date:  30 September, 2013


Contact: Christopher Zoog


Medium: Email


Subject: Testing Procedures Help


Questions:
Hey Chris,


The next portion of my project (after choosing final solutions for my designs) is to create a list of testing procedures. I am having trouble thinking of the types of testing that would be applicable to my designs. Could you provide some insight on how I would test my designs, and then prove my test results? I can send you a list of what my teacher has given us as a guide- maybe you can expand?
I will also send you drawing of the few final solutions that i have sketched for reference.
Thanks for your time,
Matt


Response:


Hi Matthew,


Sorry to take so long to respond, I sometimes lose track of emails in my gmail inbox.  The best and fastest way to reach me is my work email: christopher.zoog@hok.com.


I took a look at your blog...very thorough work so far!  Each of the different solutions are feasible, it just a matter of balancing performance, cost, aesthetic...but you already know this.


In regard to testing and validating your design, are you thinking of what you can do with the resources you have at hand, or how a design is validated with typical industry tools (analysis software, physical mock-ups, etc)?


I can tell you how we would go about testing:


For columns, beams, caissons, decking and railings, our structural engineers would make a structural analysis model that would be based on the architectural or structural design (BIM) model.  The software would stress the structural system to it's breaking point, then come up with optimal sizes of each type based on the material chosen, and the loads specified.This gets fed back into the building information model for further refinement.  (I know this is not a building we are talking about but the principle is the same)


Now because this a boardwalk, we are very concerned with the lateral forces imposed on the structure (wind, water are forces that act laterally), and as such we would do a wind tunnel test, or use computational fluid dynamics (CFD) software to test these effects.  A wind tunnel test consists of a scale model of the structure, loaded with sensors, and placed in a big wind tunnel (room with a huge fan).  CFD software simulates the effects of wind and water of a digital version of the model.


Finally, as architect, I would be concerned that boardwalk is large enough to handle the big summer crowds, and has the proper number of exits, and that those exits are properly sized.  For that I use a pedestrian simulation software to, you guessed it, simulate how people move through the space.  We can find crowding hot-spots, areas that are bottle necks, and exits that may be too small and unsafe.


I'll put together some images and animations of what these things look like.
Now if you are talking about testing you can do on your own, i would say the best thing would be to build a crude and small model of a section of the boardwalk of our balsa wood.  You could load it up with weights so see which design is strongest.  Not sure if that is part of you assignment though.


When you get a chance, send me the ideas your teacher had, i may be able to expand on them.


Keep up the good work.


Best,
Chris


Conclusion: Chris mentioned professional practices for testing procedures. These testing
procedures require expensive programs that my group does not have access to. Because of this, it appears that we won't be able to determine exactly how much force can be resisted by our designs. Chris did however suggest that we model our designs out of balsa wood and test each with various weights to determine which is the strongest. This will be time consuming but would be the best way to determine which alternate solution will be the most storm resistant, or could also be used during the testing procedures stage.


__________________________________________________________________________


Mentor Contact Page



Date:  October, 2013


Contact: Tom Micai


Medium: Visit


Subject: General Q&A Regarding Arch. Projects


Questions:
What type of permits might we need to consider when designing our Walkway?
Will tidal zone construction restrictions change if the coastal geomorphology in the target region changes?


Response:
You will need to consider mostly Tidal zone permits when designing in a coastal areas such as the beachfront of Avon. You will also need to review flood zone restrictions since the target area is so close to a large tidal body of water.
If the coat structure changes due to natural factors your permissions shouldn’t change. Once a permit is acquired in most cases It can be upheld indefinitely regardless of changes due to natural occurrences.
Conclusion:
Tom provided useful information regarding permit requirements that are common for zones such as the one our group is working in. It is crucial to follow these restrictions when designing the new walkway. Its also important to account for the difficulty of acquiring permits for specific building types when designing our structures. If we want to create a viable walkway solution that would be completely legal we MUST follow these restrictions.
_____________________________________________________________________
Mentor Contact Page



Date:  29 September, 2013


Contact: Tom Micai


Medium: Email


Subject: boardwalk restrictions (specifics)


Questions:


Mr. Micai,


Hello my name is Matthew Napoli. We met a few weeks ago at MAST to discuss my senior project. I said i would email you asking for research on boardwalk restrictions, flood hazard act rules, and design requirements for floodway structures. If you haven’t already, would it be too much to ask for you to look for these documents and send them to me? If you don't have the time it's no big deal.


Thanks!


Matt


Response:


Hello Matt:  Attached are the Flood Hazard Act rules, and the two CAFRA rules.  I suggest looking in the Table of Contents for each rule to find the topic you are interested in.  If you need help, let me know when to call you.  Have fun!!



Conclusion: After reviewing the documents regarding Flood Hazard Act Rules and CAFRA regulations that Mr. Micai sent me I gained insight on mandatory regulations in NJ that I would need to follow in my designs. One of the regulations that changed the designs I already had were regulations regarding floodway entrance regulations. I needed to include more open spaces where water could flow through to reduce stress on the entire design.
__________________________________________________________________________


Mentor Contact Page

Date: 10 October, 2013

Contact: Jackie Schnider.

CEO and President
American Custom Fabricators, Inc. 215A Hickory Lane | Bayville, NJ 08721
Phone 732.237.0037 | Fax 732.237.0039
info@americanrailings.com

Medium: Phone Call

Subject: American With Disabilities Act design requirements. Shipping methods and assembly. 

Questions: On your website you mention that you design all handrail solutions in accordance with the Americans With Disabilities Act requirements. What major aspects in your design are a direct result of adherence to this act? How are your solutions shipped? Does your company assemble the railing systems and if so is there an additional charge associated with this service?



Response: A list of all regulations set by the Americans With Disabilities Act can be found at:
http://www.ada.gov/regs2010/2010ADAStanards/2010ADAstandards.html  Some of the major design changes that are a result of this act are: Edge protection that prevents wheelchairs or other mobility devices from slipping off the fishing pier or platform, and that at least 25 percent of the railings, guards, or handrails shall be 34 inches (865 mm) maximum above the ground or deck surface. As far installment is concerned, we do not install the railing systems ourselves. However we provide a comprehensive exploded cad drawing of the design for the buyer to use as a guide for installation. We ship our solutions within 48 hours after completion through United Postal Service.

Conclusion: Learning about the Americans with disabilities act was crucial because without it we may have made our designs out of regulation. The fact that the company doesn't install the railing is unfortunate but is somewhat ameliorated by the comprehensive installation directions that they provide. Getting a chance to speak to the CEO of this company and get automatic feedback over the phone shows that this company cares about its customers and therefore makes them an attractive company to employ.





















Monday, November 11, 2013

Formal Presentation Self Evaluation

The formal progress report was intended allow each student to update the class on the progress that they have made up to this  point in the design process. Most students had already given an initial presentation which provided background information surrounding their specific job, and were now able to report on the progress they have made throughout the marking period. My presentation focused on the final solution that I chose for my beach pass vending hut design. In addition to sharing my chosen solution, I included all developmental work that I had accumulated up to this date.
Since this was my second formal presentation I had insight on common mistakes that are made during a presentation such as this, and also was able to make corrections based on errors that I made in my previous update. One major problem identified in my last presentation was the choppiness. The source of the choppiness was mainly found in between topics when switching between blog posts, web, pages and images. To combat this I prepared a compilation of links to pages that I would be speaking on in the order that they appeared in my presentation. This eliminated the time I would have spent attempting to locate specific pages and would have improved the overall conciseness of my presentation.
The strongest portion of my presentation was the section I included that rationalized why I chose the Beach Pass Vending Hut solution. For the solution I presented documents including the original list of alternate solutions, a formal rationale articulating the reasons for my choice, a supporting design matrix, working drawings of the solution and additional informal developmental work including notes, sketches and calculations. With all of these materials to back up my decision, I was able to truly convince the audience that my chosen solution was the best possible choice; This extensive support material was presented in a concise and easily understood manner making it the strongest section of my presentation.
As far as content and visuals are concerned, the ones I provided were on- par. I included enough images and visually oriented informationals to effectively convey my thoughts and ideas. One helpful addition that could have been made would have been to include more detailed working drawings. Last year, our systems class didn't use AutoCad at all and the year before we received no more than an introduction to 3D modeling. This made the drawing process slow going and ultimately reduced the quality of my computer aided renderings. Since this presentation was intended mainly to explain the final solutions and to convey their significance, the lack of working drawings was definitely the weakest segment. In the progress update I included 2 working drawings of my Beach Pass vending hut Solution. A front, side, rear view 2D drawing, and a SE isometric view of the infrastructure. The 2D drawing was simple, but conveyed the form, shape and mood of the solution effectively. The component that the 3D drawing lacked was measurements. The reduced quality of my working drawings made it harder for the audience to fully understand the functionality of my designs and made this the weakest part of the presentation.
If i had made completing my working drawings my number one goal when preparing for my presentation, the overall quality would have been enhanced. To make sure that this doesn’t happen again I plan on identifying the most important component of my presentation right away so I can devote the majority of my time to it. I won’t wait until the last minute to finish the most crucial component so I have time to overcome unexpected challenges that may surface.
While watching my presentation I realized that the visuals I provided were difficult to see from where the audience was seated. The annotations that I included on my 2D drawings were not visible and some of the detail displayed in my renderings was hard to decipher.

Each time I present I gain further insight on how to deliver my information to the audience more effectively. This time I learned that I should focus on the most important aspects early on so quality isn’t sacrificed due to time restrictions. I also realized after watching my presentation that my visuals should be displayed at a higher resolution. Determining these imperfections within my presentation is crucial because realizing what went wrong allows me to fix it for next time.

Friday, November 1, 2013

Tuesday, October 15, 2013

Railing Solution Research

Railing Solution Research

 
Post Road Iron Works: Custom Railing Systems

Post Road Iron Works is a company specializing in structural and ornamental metalwork. The company has designed various structures and has worked on a diverse range of railing solutions in locations such as Yankee Stadium, NASDAQ, MTA subway station, and the FDR boardwalk. The company as a whole has received excellent feedback from almost all clients that have hired them in the past, and continue to design functional railing systems for commercial and residential applications all around the country.

The FDR Boardwalk, located in South Beach Staten Island, utilizes a railing system designed by Post Road Iron Works. The railings are constructed from painted steel and include six horizontal rails placed underneath the main handrail. These additional rails are meant to increase the stability of the railing as a whole and also prevent boardwalk users from climbing under the railing in order to access the beach.

Post Road Iron Works designs a wide range of custom made railing systems which they design in conjunction with the specifications and needs of the client. They have designed systems for an abundance of different environments, and have experience in designing solutions specifically for boardwalks. Post Road Iron Works can provide a viable solution catered to the specific needs of the  Avon Walkway railing system. 
 
FDR Boardwalk, gazebo and rail system. South Beach, Staten Island, NY.

FDR railing system. Painted steel.


_______________________________________________________________________________

Wagner Companies: Boardwalk Railing
 


Wagner Companies strives to recreate the mood of "Historical Boardwalk Railings". Their railings are constructed of aluminum and are connected at joints and vertices. All Wagner railing systems are made in the U.S.A. and the aluminum is produced from 100% recycled post industrial product.
 

 Wagner Companies provide two viable railing system solutions for the new Avon walkway. The Wagnerail is made of 100% recycled aluminum connected at joints will ball fittings. The Wagnerail is the most popular railing system made by Wagner due to it's rigid construction, rust resistant materials and relatively inexpensive design. The Kalamazoo rail is similar in material and style to the Wagnerail but is coated with a protective black sealant over the aluminum to further enhance durability. The Kalamazoo Rail is also designed in order to be placed on inclines/ declines such as stairs, ramps or natural changes in elevation. The Kalamazoo Rail is substantially more expensive than the Wagnerail.

Both solutions provide a viable option for the railing system that is to be implemented on the new walkway. The Wagnerail can only be used on level surfaces since there is no design for changes in elevation such as on stairs or ramps. The Kalamazoo rail is designed to be placed on changes in elevation but is more expensive than the Wagnerail. Aside from these drawback, both railing systems provide a classic looking, environmentally friendly solution for a railing system to be placed on the new Avon Walkway.



For 1-1/2" Aluminum Pipe (1.90" Diameter)
Welded Assembly
For 1-1/4" Aluminum Pipe (1.66" Diameter)
Adhesive Assembly


________________________________________________________________________________
 

American Custom Fabricators Incorporated: Modular Railing System



American Custom Fabricators is a local company located in Bayville, NJ. They design Modular railing systems and Awnings for both residential and commercial use. American Custom Fabricators Inc. designed the new railing system that is to be implemented on the new Avon Boardwalk.

American Custom Fabricators Inc. uses a process for designing their railing systems that ensures a perfect design by including the client in the design process. AutoCAD drawings are developed from measurements taken by the client, and are then approved by the client before manufacture. Once the plans are finalized, the manufactured product is ready to be shipped within 24 hours.

American Custom Fabricators Inc. provides a railing system that will meet the needs of the new Avon boardwalk made evident by the fact that the actual boardwalk planners chose this company for their new boardwalk. The company includes the client in their design process ensuring an adequate final product. They also provide step by step instructions for installation based on the AutoCAD drawings created during the design process. American Custom Fabricators Inc. is a local business with excellent reviews that has been by the town of Avon to design the railing for the new Avon Boardwalk. This proves that they will provide an excellent solution for the railing system on the new Avon Walkway.



Redesigned Avon Boardwalk. American Custom Fabricators Inc. Railing pictured on the right.
Redesigned Avon Boardwalk. American Custom Fabricators Inc. Railing pictured at center.



Generic modular railing system designed by American Custom Fabricators
Generic multi-level modular railing system. American Custom Fabricators

 
__________________________________________________________________________________
 
 
 
Works Cited
 
Braun, J.G. "Wagnerail." Heavy Cast Aluminum Fittings for Assembly of Handr. Wagner
 
          Companies, 2011. Web. 15 Oct. 2013.
 
"FDR Boardwalk on South Beach." Post Road Iron Works. Structural and Ornamental Metalwork,
 
          n.d. Web. 15 Oct. 2013.
 
Schinder, Bob. "American Custom Fabricators." American Custom Fabricators. N.p., 2010. Web. 15
 
          Oct. 2013.